👥 Who it’s for: Chief Estimators, Precon Managers, Executives
🗓 When to use it: As soon as an ITB or RFP arrives
Every bid you chase costs estimating hours. Muro reads the bid documents, scores the opportunity against your criteria and compares it with similar past projects, so you can decide quickly and explain why.
At a glance
📁 Add these files | ITB or RFP · Optional: drawings and specs · your go/no-go criteria · a list of past projects |
🔌 Connect (optional) | Your CRM (e.g., Microsoft Dynamics 365) for your pipeline and past projects |
📄 You get | A go/no-go score with the reasons behind it, a comparison with similar projects, and a one-page summary for leadership |
⏱ Takes about | A few minutes per step |
Example output (illustrative data)
What to ask
1. Score the opportunity:
Score this opportunity for go/no-go. Look at size, schedule, location, owner, delivery method and our current backlog.
2. Compare it with past work:
Compare this project with similar projects we've bid or built, and show how we did.
3. Summarize for leadership:
Write a one-page go/no-go recommendation with the score, the main risks and what it would take to win.
Go further:
What in the bid requirements could hurt us? Check bonding, insurance, prevailing wage and the schedule.
Update our pipeline and backlog report with this bid.
Set up this project in BuildingConnected from the ITB.
Tips & best practices
✅ Give Muro your criteria. Upload the checklist your team already uses, or list it in the request. The score follows your rules.
💡 Add past projects. A simple list of past bids, with size, type and result, makes the comparison much better.
💡 Decide early. Run it the day the ITB arrives, before anyone starts a takeoff.
✅ Check the reasons, not just the score. Muro shows why. Your team makes the call.
Good to know
Without your criteria, Muro uses common go/no-go factors and tells you which ones it used.
The score is only as good as the information you add. Missing documents mean a less complete picture.


